![]() |
||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||
|
Scenarios |
||||||||||||||||||||||||||||
|
Below is a list of the scenarios supplied with the VROV system1. Custom scenarios are readily available and further information can be found in the Mission Planning and Rehearsal section on the Services page. Video quality may be reduced due to compression. For full resolution videos, feel free to contact us. | ||||||||||||||||||||||||||||
|
Basic / Default Scenario Package
|
||||||||||||||||||||||||||||
|
1. Blow Out Preventer (BOP) Installation This scenario is designed to practice installing a BOP on a wellhead. Before the BOP can be installed, the used gasket must be replaced with a new one. |
Download Diveplan |
![]() Download Video (8.0Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
2. Locate and Retrieve Debris This scenario is designed to practice locating and retrieving debris hidden among the barrels located on the ocean floor. |
Download Diveplan |
![]() Download Video (3.0Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
3. Field Inspection This is an inspection scenario consisting of a Template with the BOP and TFL installed, 3 Wells with flowlines running from the Template, and a Platform. |
Download Diveplan |
![]() Download Video (3.9Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
4. Pipeline Inspection This is an inspection scenario consisting of a subsea field that includes Manifolds, Trees, PLETs, and a BOP. |
Download Diveplan |
![]() Download Video (2.7Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
5. Pod Posting This scenario is designed to practice delivering a supply pod to a disabled submarine that is stranded on the ocean floor. |
Download Diveplan |
![]() Download Video (4.2Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
6. Sub Rescue This scenario is designed to practice cutting cables to rescue a submarine stranded on the ocean floor. |
Download Diveplan |
![]() Download Video (3.4Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
7. TFL Prepare and Install This scenario is designed to practice installing the TFL on the E2 Hub. The hub debris cover must be removed and the hub cleaned before the TFL is installed. After installation, all rigging is to be removed from the TFL. |
Download Diveplan |
![]() Download Video (5.6Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
8. TFL Prepare and Install DS (Drill String) This scenario is designed to practice installing the TFL on the E2 Hub. The hub debris cover must be removed and the hub cleaned before the TFL is installed. After installation, the Drill String is to be removed from the TFL using the torque tool. |
Download Diveplan |
![]() Download Video (7.1Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
9. TFL Lock and Test This scenario is designed to practice locking a previously installed TFL to the template using a torque tool. Once the TFL is locked, a seal test is performed using a hydraulic hot stab. |
Download Diveplan |
![]() Download Video (6.3Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
10. Transponder Recovery This scenario is designed to practice deploying and recovering transponders to and from a "Chicken Foot" that is suspended above the ocean floor. |
Download Diveplan |
![]() Download Video (2.7Mb) (Right click & save as) |
||||||||||||||||||||||||||
|
1 The number of scenarios and objective of each scenario provided with VROV may change at any time. | ||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||